Project Description: This project consists of replacing existing Cooling Towers , structural steel for new cooling towers, demolition of existing roof and install new, asbestos abatement, new piping, new pumps, The new cooling towers runs on VFD’s therefore saving energy. The new fan of the tower was also designed in such a way so that it consumes minimum energy. The new controls system saves and conserves energy as well. |
A SERVICE DISABLED VETERAN OWNED COMPANY |
90 Dayton Ave, Bldg 16C, Ste 205 A/B, Passaic, NJ 07055 ♦ 973-685-7216 ♦ www.concentricgroup.biz
|
Replace Cooling Towers VAMC Bronx Campus |
@ Remove existing cooling tower @ Structural steel @ New piping @ New pumps @ New electrical & Controls @ Install new cooling towers @ Demolition of existing roof @ Asbestos abatement @ New Roofing
|
Scope of Work: |
Contract Amount: $4,593,471 |
Duration: Oct 11, 2011—Sep 15, 2013 |
Owner: Department of Veterans Affairs Network Acquisition & Logistics 130 Kingsbridge Road Bronx, NY 10468 |
|
Owner Contact: Patricia Cordero, Contracting Officer 718-584 9000 x 4928 Patricia.Cordero@va.gov |